189_LNG Terminal Krk

Project Scope:
The Project Scope of EPC Contract is the design, engineering, procurement and construction, commissioning, trial operations and startup of jetty with the auxiliary facilities and connecting of high-pressure gas pipeline for the LNG import terminal on the Island of Krk, based on a Floating Storage & Regasification Unit ("FSRU"). 

Bauzeit:
04/2019 – 12/2020

Archivdatum: 22.12.2020

Mo. Di. Mi. Do. Fr. Sa. So.
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31

Zur Übersicht

22.12.2020 07:00
22.12.2020 07:30
22.12.2020 08:00
22.12.2020 08:30